Manawatu Catchment Board :Proposed flood control scheme lower Manawatu River [copy of ms map]. Plan no. 87. Sheet no. 1. 1945.

Date
1945
By
Manawatu Catchment Board and Regional Water Board; Wilkinson, P R, active 1946-1949
Reference
MapColl-832.43cdc/1945/Acc.9267
Description

Manawatu Catchment Board proposed flood control scheme for the lower Manawatu River, 1945. The plan outlines stage one of a five year plan of flood protection for the river from Whirokino to Ashurst.

Shows flood protection river cuts, stopbanks, outfall drains, raised banks ponding areas, an alternative cut, as well as a 200 ft wide channel through Moutoa.

Also shows a diagram above the map entitled 'Longitudinal profile along cut' that depicts the 1902 flood level, stopbank heights, low level bank heights, ground levels along the cut and the mean contruction level on the bottom of the cut.

Plan number on map has been changed from 1/6 to 87, before copying.

Drawn by P.R.W. [P.R. Wilkinson, registered surveyor] & D.J.B.H. 29.6.45. 'Comptns D.J.B.H 29.6.45'.

Original signed by Malley, Engineer, 2 7 [19]45.

Quantity: 1 map(s).

Physical Description: Diazo print, linen backed, scale [1:31 680], 56.6 x 75.2 cm.

Use/Reproduction
Photocopying not permitted. Reproduction for publication requires the permission of the owner of the original.
Access restrictions
No access restrictions
Format
1 map(s), Maps, Diazo print, linen backed, scale [1:31 680], 56.6 x 75.2 cm.
See original record

Click to request to view this item, access digital version (if available), and see more information.