The Glenfield Church under construction - 9 am

Date
4 Sep 1915
Reference
1/2-037500-G
Description

View of the church under construction. The wall and roof framing are up, and nearly all the weather boards are in place. A Union Jack is flying from the roof. About nineteen men can be seen working on the construction. One of a series of photographs taken during the day by William Archer Price.

Inscriptions: Photographer's title on negative - bottom centre - The Glenfield Church built in a day. 9 am. 4.9.15. No 1007d.

Relationship complexity - Other photographs taken during construction on 4 Sep 1915 are available at 1/2-029063 (6.30am); 1/2-001861; 1/2-037499 (about 7.30am); 1/2-002064 (about noon); 1/2-001862 (3pm); 1/2-001863 (church completed)

Quantity: 1 b&w original negative(s).

Physical Description: Dry glass plate negative 4.5 x 6.5 inches

Access restrictions
Partly restricted - Curator required
Part of
Price, William Archer, 1866-1948 :Collection of post card negatives
Format
1 b&w original negative(s), Negatives, Dry glass plate negative 4.5 x 6.5 inches, Orientation: Horizontal image
See original record

Click to request to view this item, access digital version (if available), and see more information.

Copyright

Unknown